PROJECT OVERVIEW

The new car park at the Westin Dragonara Resort required a complete and durable marking system to organise vehicle circulation across its three parking levels. Before any paint was applied, the concrete floors were mechanically ground and thoroughly washed, for a clean, properly prepared surface.

Advanced Safety then applied the full layout in Crosscote, comprising bay lines, directional arrows, accessible bays and signage, defining 87 parking bays including four accessible bays. A heavy-duty acrylic concrete sealer was applied over the finished surface to protect it against wear and tear, staining and to simplify routine cleaning.

The project was completed within five to ten days.

PROJECT FACTS

Levels Three: Level -2 and Level -1 for parking, with a garden level above
Parking bays 87: 45 on Level -2 and 42 on Level -1
Accessible bays 4: two on each parking level
Markings Bay lines, directional arrows, accessible bay symbols and signs
Surface Concrete
Preparation Floor grinding, cleaning and washing
Finish Heavy-duty acrylic concrete sealer over Crosscote
Duration 5 to 10 days
Challenge Level -2, the lowest floor, needed extra time to dry