| CLIENT | SERVICES USED | YEAR | PRODUCTS USED |
| The Westin Dragonara Resort, Malta | Floor markings
Floor grinding and washing Crosscote Concrete sealing |
2026 | Crosscote
Heavy-duty acrylic concrete sealer |
PROJECT OVERVIEW
The new car park at the Westin Dragonara Resort required a complete and durable marking system to organise vehicle circulation across its three parking levels. Before any paint was applied, the concrete floors were mechanically ground and thoroughly washed, for a clean, properly prepared surface.
Advanced Safety then applied the full layout in Crosscote, comprising bay lines, directional arrows, accessible bays and signage, defining 87 parking bays including four accessible bays. A heavy-duty acrylic concrete sealer was applied over the finished surface to protect it against wear and tear, staining and to simplify routine cleaning.
The project was completed within five to ten days.
PROJECT FACTS
| Levels | Three: Level -2 and Level -1 for parking, with a garden level above |
| Parking bays | 87: 45 on Level -2 and 42 on Level -1 |
| Accessible bays | 4: two on each parking level |
| Markings | Bay lines, directional arrows, accessible bay symbols and signs |
| Surface | Concrete |
| Preparation | Floor grinding, cleaning and washing |
| Finish | Heavy-duty acrylic concrete sealer over Crosscote |
| Duration | 5 to 10 days |
| Challenge | Level -2, the lowest floor, needed extra time to dry |