2026 Advanced Safety cleaned the 144,000-litre underground water reservoir at Noru Hotel, St Julians, found it very dirty, and reported three critical issues.
| Job record | |
| Client | Noru Hotel, St Julians, Malta |
| Tank | Underground, coated concrete, 144,000 litres, half full on arrival |
| Condition on arrival | Very dirty: limescale, biofilm, sediment, mould or algae and stains |
How the tank was cleaned
- Inspected the tank inside and out, set up PPE and equipment.
- Drained the tank: opened taps on every floor, used an industrial pump and applied a high-dose chlorine shock treatment during discharge where feasible.
- Removed sludge and sediment by hand from the tank floor.
- Pressure-washed all internal surfaces to lift scale, biofilm and staining.
- Scrubbed stubborn calcium and stains with hand scrapers and brushes.
- Rinsed every surface with clean potable water.
- Inspected after cleaning, documented the findings and handed the report to the client.
What the inspection found
Raised pump. The submersible pump sits on a raised platform, which cuts usable capacity by nearly 25%.
Hairline crack. A small crack in the inner lining sits on the manhole side, 2 m from the bottom, 9 m from the manhole and 0.5 m below the waterline. No leakage was seen. Marked in red below, before and after cleaning: