CLIENT

Noru Hotel, St Julian’s

2026 Advanced Safety cleaned the 144,000-litre underground water reservoir at Noru Hotel, St Julians, found it very dirty, and reported three critical issues.

Job record
Client Noru Hotel, St Julians, Malta
Tank Underground, coated concrete, 144,000 litres, half full on arrival
Condition on arrival Very dirty: limescale, biofilm, sediment, mould or algae and stains

How the tank was cleaned

  1. Inspected the tank inside and out, set up PPE and equipment.
  2. Drained the tank: opened taps on every floor, used an industrial pump and applied a high-dose chlorine shock treatment during discharge where feasible.
  3. Removed sludge and sediment by hand from the tank floor.
  4. Pressure-washed all internal surfaces to lift scale, biofilm and staining.
  5. Scrubbed stubborn calcium and stains with hand scrapers and brushes.
  6. Rinsed every surface with clean potable water.
  7. Inspected after cleaning, documented the findings and handed the report to the client.

What the inspection found

Raised pump. The submersible pump sits on a raised platform, which cuts usable capacity by nearly 25%.

Hairline crack. A small crack in the inner lining sits on the manhole side, 2 m from the bottom, 9 m from the manhole and 0.5 m below the waterline. No leakage was seen. Marked in red below, before and after cleaning:

SERVICES USED

Tank and Pipe Cleaning

YEAR

April 2026